- Water and sewage is included. Water and sewage have to be available within 1m from the connection point of the office building.
- One wheelchair ramp is included.
In totalt it looks like the new offer is minimal better than the old one.
No one was notified
Jonny Andersen
This is included: - Furniture as shown on the drawing - Simple Kitchen, with sink, fridge, and kabinets/draws - Simple showercorner inside the handicap toilet - Water and sewage connection - Internal powering, but they need 3 x 32 amp 230/400V for connecting - One wheelchair ramp is included
This is not included: - Data cabling is not included, but there are ducts to each Office for this.
No one was notified
Denis Slabakov
Great, any discount on the price?
Notified 1 person
Jonny Andersen
They haven’t replied on that yet.
Notified 1 person
Jonny Andersen
They will give a 10% discount on the lease after 1 year.
Notified 1 person
Denis Slabakov
Great
Please ask for a contact and let’s place the order.
Notified 1 person
Jonny Andersen
I guess you ment contract?
Notified 1 person
Denis Slabakov
Yes
Contract
Notified 1 person
Denis Slabakov
Maria, please approve the order of office building.
Lease of modules, total cost per month - NOK 33 500
Transportation and assembly NOK 124 200
Disassembly and return transport NOK 100 000
Price does not include 5% insurance and VAT
From second year we are offered 10% discount on lease amount
Notified 3 people
Denis Slabakov
Maria, please approve the order of office building.
Lease of modules, total cost per month - NOK 33 500
Transportation and assembly NOK 124 200
Disassembly and return transport NOK 100 000
Price does not include 5% insurance and VAT
From second year we are offered 10% discount on lease amount
Water and sewage have to be available within 1m from the connection point of the office building.
- One wheelchair ramp is included.
In totalt it looks like the new offer is minimal better than the old one.
- Furniture as shown on the drawing
- Simple Kitchen, with sink, fridge, and kabinets/draws
- Simple showercorner inside the handicap toilet
- Water and sewage connection
- Internal powering, but they need 3 x 32 amp 230/400V for connecting
- One wheelchair ramp is included
This is not included:
- Data cabling is not included, but there are ducts to each Office for this.
Please ask for a contact and let’s place the order.
Contract
Lease of modules, total cost per month - NOK 33 500
Transportation and assembly NOK 124 200
Disassembly and return transport NOK 100 000
Price does not include 5% insurance and VAT
From second year we are offered 10% discount on lease amount
Lease of modules, total cost per month - NOK 33 500
Transportation and assembly NOK 124 200
Disassembly and return transport NOK 100 000
Price does not include 5% insurance and VAT
From second year we are offered 10% discount on lease amount